The Royal Hawaiian
Iconic "Pink Palace" with panoramic views and a history of refinement.
Since its establishment in 1927, The Royal Hawaiian has been known for its signature shade of pink. In 2022, the Zelinsky team completed the exterior painting and spall repairs of the hotel’s Historic Wing to maintain its classic appearance. Due to the hotel’s design, accessing every square inch of the exterior presented our crew and safety officer with many challenges. Our team worked to ensure this project was carried out safely, on time, and with as little interruption to the hotel guests as possible.
PROJECT SPECS
- Scope: 1 Phase
- Area: 180,000 Square Feet
- Timeline: 8 months
Project Details
- Exterior Painting
- Spall and Repair
- Swing Stage Scaffolding
- Boom Lift